Trity Environ Solutions is a trusted STP and ETP plant manufacturer in Dibrugarh, building wastewater systems for oil and gas linked units, tea processing, and food industry, and for hotels, hospitals, and housing in the city. With the Burhi Dihing and the upper Assam oil belt in the news, it designs plants that keep oily discharge measurably inside limits, with pan India installation support behind every project. Whether you need a sewage treatment plant manufacturer in Dibrugarh or an effluent treatment plant manufacturer in Dibrugarh, Trity Environ Solutions builds both in-house, from design to commissioning.
In February 2020 a stretch of the Burhi Dihing in Dibrugarh district was reported on fire after crude oil spilled from a line carrying crude to the Digboi refinery, a report summarised by Drishti IAS. The report gave no figure for the spill and named no company or regulatory action, but it shows how close oil bearing material sits to the river in this part of Assam. In upper Assam, the Pollution Control Board, Assam (PCBA) has also acted against oil field operations, including a closure notice in June 2020 to Oil India's Baghjan field in neighbouring Tinsukia district, which the board said operated without consent to establish and operate.
For a unit in Dibrugarh that produces oil, grease, or high COD wastewater, the approach is to separate free oil at source, treat the emulsified fraction, and keep a dated record of treated water quality. A 2021 state report to the National Green Tribunal said there was no existing sewage treatment plant in Assam and did not list Dibrugarh among the cities with plants planned, so city projects here cannot assume a public connection either. Trity Environ Solutions builds effluent treatment plants for oil bearing, tea, and food units, and sewage treatment plants for Dibrugarh's housing, hospitals, and hotels, designed against your real load and consent conditions.
Request a free site assessment for your Dibrugarh site and the engineering team will confirm the right configuration.
For the wider picture across the state, see our STP and ETP plant manufacturer in Assam page.
Oil and grease separation ahead of biological and chemical stages, designed for oily process and wash water.
Biological stages for the high organic load of processing units.
Equalisation and buffer capacity sized for the flow surges heavy rain brings.
Modular MBBR and MBR layouts for hospitals, hotels, and housing in Dibrugarh where land is limited.
Installation, operator training, and AMC response across Dibrugarh and the upper Assam belt.
When oil bearing water is close to a river, one failure can be seen and reported quickly. A plant with oil separation, sampling points, and a dated log of treated water quality is the strongest position when PCBA inspects. Where a unit wants to cut fresh water use, a wastewater recycling system can be added after the main treatment train.
Dosing pumps drift, blowers wear, and sludge handling slips when nobody watches them. Trity Environ Solutions supports every Dibrugarh installation with operator training, performance checks, and an Annual Maintenance Contract, so treated water stays within limits through monsoon and production swings. Talk to our team about AMC coverage for your facility.
Trity Environ Solutions also has state level pages for a sewage treatment plant manufacturer in Assam covering housing, hospitals, and hotels, and an effluent treatment plant manufacturer in Assam covering industrial effluent.
Our oil water separator separates free oil from process and wash water before further treatment.
Our chemical industry effluent treatment plant handles high COD, acidic, alkaline, and difficult process water.
Our food and beverage effluent treatment plant handles the high organic load from processing and packaged food units.
Our MBBR sewage treatment plant fits basement and podium layouts and holds treated quality across peak swings.
Our MBR sewage treatment plant delivers high quality, low odour treated water in very little space, suited to reuse for cooling and flushing.
Flow measurement and sampling establish your actual load, including oil, COD, and BOD.
Technology and layout are fixed against PCBA consent conditions, available footprint, and reuse targets.
Components are manufactured under ISO 9001:2015 quality controls, then installed and commissioned by Trity's site team.
The plant is tested against consent limits, operators are trained, and ongoing AMC support keeps performance consistent afterward.
The Pollution Control Board, Assam (PCBA) issues consent to establish and consent to operate, alongside CPCB guidelines and National Green Tribunal directions.
Yes. Oil bearing wastewater needs oil separation, emulsion breaking, and stronger treatment stages than a standard plant, so each system is designed from your own effluent analysis.
Yes. Processing effluent carries a high organic load, so the plant is sized from your own effluent analysis and production season.
Large residential, commercial, and healthcare projects generally need an STP as part of building approval and PCBA consent conditions. Thresholds vary by project size and category, so confirm yours with the local authority.
Prefabricated modular plants typically commission within 45 to 90 days, while civil-based plants for larger capacities take 3 to 6 months from design approval to handover.
Yes. We audit existing plants, retrofit capacity or technology, and take them under an annual maintenance contract.
Look for in-house manufacturing, experience with PCBA consent requirements, a design based on your own wastewater analysis, and a clear maintenance offering after commissioning. Trity Environ Solutions builds its plants under ISO 9001:2015 quality controls and supports every installation with operator training and an annual maintenance contract.
Our engineering team can help design the right system for your capacity, industry, and compliance requirements.