Trity Environ Solutions is a trusted STP and ETP plant manufacturer in Ajmer, building wastewater systems for the hotels, dharamshalas, hospitals, housing, and small industry of Ajmer. With Ana Sagar under Tribunal attention, it designs plants that hold treated water inside limits and make it reusable, with pan India installation support behind every project. Whether you need a sewage treatment plant manufacturer in Ajmer or an effluent treatment plant manufacturer in Ajmer, Trity Environ Solutions builds both in-house, from design to commissioning.
In a December 2022 reply to the National Green Tribunal, the Rajasthan State Pollution Control Board (RSPCB) said a 13 MLD sewage plant had been installed in 2014, but a September 2022 inspection found only 2 of 11 drains connected to it, with the other 9 discharging untreated into Ana Sagar lake. The board issued a notice to the Ajmer Municipal Corporation for an upgrade plan, citing the Tribunal's order of April 2019, and asked for aeration in the lake. The corporation said about 10 per cent of household sewer connections were pending, a claim we could not confirm was met.
A 2019 Patrika report said a diverted drain, built under a city scheme, had been shut for months and that flow of about 3.5 MLD at a BOD of 135 reached the lake. That is a newspaper account, and its strong wording is its own. We found no city wide sewage generation figure. Ajmer also receives large numbers of pilgrims at peak seasons. Trity Environ Solutions builds sewage treatment plants for Ajmer's hotels, dharamshalas, hospitals, and housing, sized for peak load, and effluent treatment plants for small industry, designed against your real load and RSPCB consent conditions.
Request a free site assessment for your Ajmer site and the engineering team will confirm the right configuration.
For the wider picture across the state, see our STP and ETP plant manufacturer in Rajasthan page.
Equalisation and spare aeration so a plant copes with the busy season, not only the average month.
Sampling points and a dated log of treated water quality for a lake under Tribunal attention.
Polished water for cooling, flushing, and gardens, which cuts fresh water demand and tanker use.
Modular MBBR and MBR layouts for hospitals, hotels, and housing in Ajmer where land is limited.
Installation, operator training, and AMC response across Ajmer and nearby industrial areas.
The 2022 inspection found plants built but drains not connected. A plant with a flow meter and a dated log is the strongest position at inspection. A grey water treatment plant can separate lighter wastewater so more of it is reused.
Dosing pumps drift, blowers wear, and sludge handling slips when nobody watches them. Trity Environ Solutions supports every Ajmer installation with operator training, performance checks, and an Annual Maintenance Contract, so treated water stays within limits through peak load and seasonal swings. Talk to our team about AMC coverage for your facility.
Trity Environ Solutions also has state level pages for a sewage treatment plant manufacturer in Rajasthan covering housing, hospitals, and hotels, and an effluent treatment plant manufacturer in Rajasthan covering industrial effluent.
Our MBR sewage treatment plant delivers high quality, low odour treated water in very little space, suited to reuse.
Our MBBR sewage treatment plant fits basement and podium layouts and holds treated quality across peak swings.
Our packaged containerized sewage treatment plant is a factory built, quick to commission option for smaller flows.
Our physico-chemical effluent treatment plant removes metals and suspended solids through pH correction, coagulation, and clarification.
Our wastewater recycling system polishes treated effluent through ultrafiltration and RO so it can return to the process.
Flow measurement and sampling establish your actual load, including flow pattern, seasonal peak, and occupancy.
Technology and layout are fixed against RSPCB consent conditions, available footprint, and reuse targets.
Components are manufactured under ISO 9001:2015 quality controls, then installed and commissioned by Trity's site team.
The plant is tested against consent limits, operators are trained, and ongoing AMC support keeps performance consistent afterward.
The Rajasthan State Pollution Control Board (RSPCB) issues consent to establish and consent to operate, alongside CPCB guidelines and National Green Tribunal directions.
Yes, if it is designed for it. Equalisation and spare aeration capacity are sized for the busy season, not the average month.
A 13 MLD plant was installed in 2014, but a 2022 inspection found most drains not connected, so confirm the current position and plan for on-site treatment.
Large residential, commercial, and healthcare projects generally need an STP as part of building approval and RSPCB consent conditions. Thresholds vary by project size and category, so confirm yours with the local authority.
Prefabricated modular plants typically commission within 45 to 90 days, while civil-based plants for larger capacities take 3 to 6 months from design approval to handover.
Yes. We audit existing plants, retrofit capacity or technology, and take them under an annual maintenance contract.
Look for in-house manufacturing, experience with RSPCB consent requirements, a design based on your own wastewater analysis, and a clear maintenance offering after commissioning. Trity Environ Solutions builds its plants under ISO 9001:2015 quality controls and supports every installation with operator training and an annual maintenance contract.
Our engineering team can help design the right system for your capacity, industry, and compliance requirements.