Trity Environ Solutions is a trusted STP and ETP plant manufacturer in Hisar, building wastewater systems for the steel, cotton, foundry, and rolling units of Hisar, and for housing, hospitals, and hotels. With Hisar among the better placed Haryana districts on sewage treatment, it designs plants that keep industrial discharge measurably inside limits, with pan India installation support behind every project. Whether you need a sewage treatment plant manufacturer in Hisar or an effluent treatment plant manufacturer in Hisar, Trity Environ Solutions builds both in-house, from design to commissioning.
A 2026 CAG audit covering the period to March 2024 found Hisar had the lowest untreated sewage share among the audited districts at 17.23 per cent and was the only one where treatment capacity matched generation. That makes Hisar an exception in the state. We found no other city specific figure for plant capacity or a Budhiya drain, and we have not guessed at one.
Industry has its own history. In 2013, now old, the board served notices on two steel and metal units after samples from an industrial area nullah exceeded limits for suspended solids, oil and grease, and iron. A good public sewage position does not cover industrial effluent, which needs treatment at source. Trity Environ Solutions builds effluent treatment plants for steel, foundry, rolling, and cotton units and sewage treatment plants for Hisar's housing, hospitals, and hotels, designed against your real load and HSPCB consent conditions.
Request a free site assessment for your Hisar site and the engineering team will confirm the right configuration.
For the wider picture across the state, see our STP and ETP plant manufacturer in Haryana page.
Treatment trains for oil, scale, suspended solids, and cooling blowdown.
Sampling points and a dated log of treated water quality.
Polished water for cooling, flushing, and gardens, which cuts fresh water demand and tanker use.
Modular MBBR and MBR layouts for hospitals, hotels, and housing in Hisar where land is limited.
Installation, operator training, and AMC response across Hisar and nearby industrial areas.
Industrial effluent has to meet its own limits at the outlet. A plant with a flow meter and a dated log is the strongest position. A wastewater recycling system can reduce what a unit discharges.
Dosing pumps drift, blowers wear, and sludge handling slips when nobody watches them. Trity Environ Solutions supports every Hisar installation with operator training, performance checks, and an Annual Maintenance Contract, so treated water stays within limits through peak load and seasonal swings. Talk to our team about AMC coverage for your facility.
Trity Environ Solutions also has state level pages for a sewage treatment plant manufacturer in Haryana covering housing, hospitals, and hotels, and an effluent treatment plant manufacturer in Haryana covering industrial effluent.
Our physico-chemical effluent treatment plant removes metals, iron, and suspended solids through pH correction, coagulation, and clarification.
Our oil water separator separates free oil from process and wash water before further treatment.
Our wastewater recycling system polishes treated effluent through ultrafiltration and RO so it can return to the process.
Our MBBR sewage treatment plant fits basement and podium layouts and holds treated quality across peak swings.
Our MBR sewage treatment plant delivers high quality, low odour treated water in very little space, suited to reuse.
Flow measurement and sampling establish your actual load, including oil, metals, suspended solids, and domestic load.
Technology and layout are fixed against HSPCB consent conditions, available footprint, and reuse targets.
Components are manufactured under ISO 9001:2015 quality controls, then installed and commissioned by Trity's site team.
The plant is tested against consent limits, operators are trained, and ongoing AMC support keeps performance consistent afterward.
The Haryana State Pollution Control Board (HSPCB) issues consent to establish and consent to operate, alongside CPCB guidelines and National Green Tribunal directions.
Yes. Each plant is designed from your own effluent analysis, with oil, iron, and solids handling sized for your process.
A 2026 audit found Hisar's treatment matched generation, but connection depends on your site, so confirm availability with the municipal corporation.
Large residential, commercial, and healthcare projects generally need an STP as part of building approval and HSPCB consent conditions. Thresholds vary by project size and category, so confirm yours with the local authority.
Prefabricated modular plants typically commission within 45 to 90 days, while civil-based plants for larger capacities take 3 to 6 months from design approval to handover.
Yes. We audit existing plants, retrofit capacity or technology, and take them under an annual maintenance contract.
Look for in-house manufacturing, experience with HSPCB consent requirements, a design based on your own wastewater analysis, and a clear maintenance offering after commissioning. Trity Environ Solutions builds its plants under ISO 9001:2015 quality controls and supports every installation with operator training and an annual maintenance contract.
Our engineering team can help design the right system for your capacity, industry, and compliance requirements.